RENEWABLE ENERGY DEVELOPMENT PROGRAM (PROCUREMENT/NSTALLATION OF SOLAR PANELS)
Description:
1.) 2 - unit - 12kw, 48, 230v,1Ø, 60Hz, DeyeHybrid On/Off Grid Inverter w/ WiFi Stick
2.) 30 - unit - 600w, PV, Module, Mono PERC Half cut (tier)
3.) 1 - unit - ATS, 2P, 125A
4.) 2 - unit - Rapid Shutdown Device
5.) 1 - unit - Current Limiter 100/5A
6.) 16 - lgt - Railings (Aluminum) 6.1m
7.) 60 - pcs - 1 foot (Aluminum)
8.) 56- pcs - Mid Clamp (Aluminum)
9.) 16 - pcs - End Clamp (Aluminum)
10.) 8 - pcs - Rail Splice (Aluminum)
11.) 4 - pcs - Earth Lug (Aluminum)
12.) 4 - unit - Breakers DC 63A, 550v DC
13.) 2 - unit - Breakers AC 63AT, 1Ø, 230V AC
14.) 8 - unit - SPD 600v DC
15.) 2 - unit - SPD 20-40kA AC
16.) 1 - roll - PV Cable 6mm²
17.) 60 - meters - 30mm² THHN Wire
18.) 80 - meters - 14mm² THHN Wire
19.) 10 - meters - 8mm² THHN Wire
20.) 10 - meters - 3.5mm² THHN Wire
21.) 2 - pcs - Dist. Box Flame Proof 12way
22.) 1 - unit - 4 holes NEMA 1 Panelboard
23.) 2 - unit - 150AT, 250v, 60Hz, Bolt-On Main Circuit Breaker
24.) 2 - unit - 60AT, 250v, 60Hz, Bolt-On Main Circuit Breaker
25.) 10 - lgt - Conduit 20mmØ PVC
26.) 8 - pcs - MC4 Connector
27.) 6 - lgt - Cable Duct 50x50mm* 2m
28.) 1 - unit - Ground Rod 5/8"Ø unthreaded
29.) 1 - pcs - Ground Clamp Connector 5/8"
30.) 2 - packs - Saddle Clamp
31.) 2 - pcs - 4" x 4" Sticker
32.) 1 - lot - Net Metering
Includes:
1. Primary/Secondary Line Materials
2. KWHr Meter & Accessories
3. Transformer Accessories
4. Admin Fee
5. Professional Electrical Engineer's Fee
33.) 1 - lot - Electrical Tape, Rubber Tapes, Pull Box, Junction Box, Tie Wires
Solvent Cement, Expansion Bolt, Adaptors & Locknuts, Solderless
Connector, Cable Ties, ect.
34.) 1 - lot - Delivery and Installation with Testing