You are here
CONSTRUCTION OF MITIGATING STRUCTURES IN HAZARDOUS ROAD NETWORK (FOOTBRIDGE IN BRGY. CAMIROS)
Description:
1.) 3 - month - Provision of Temporary Facilities
2.) 2 - each - Project Billboard/Signboard
3.) 1 - l.s. - Occupational Safety and Health Program
4.) 1 - l.s. - Mobilization/Demobilization
5.) 76.60 - cu.m. - Structure Excavation (Common Soil)
6.) 66.97 - cu.m. - Embankment from Roadway/Structure Excavation
7.) 2,619.68 - kgs. - Reinforcing Steel Bar, Grade 40 (Minor Structures)
8.) 26.40 - cu.m. - Structural Concrete Class A (Minor Structures)
9.) 41.60 - cu.m. - Grouted Riprap, Class "A"
10.) 293.70 - sq.m. - Painting Works (Steel)
11.) 12,129.34 - kgs. - Structural Steel (Angle Bars)
12.) 484 - each - Metal Structures Accessories (Bolt)
13.) 623.60 - kgs. - Metal Structures Accessories (Steel Plates)
Bids and ProcurementPages |
Latest News |