CONSTRUCTION CONCRETING REHABILITATION OF LOCAL ACCESS ROAD @ BRGY SAN CARLOS, ANILAO, ILOILO
Description
1.) 1 - l.s. - PROVISION OF TEMPORARY FACILITIES
2.) 2 - each - PROJECT BILLBOARD/SIGNBOARD
3.) 2.5 - month - OCCUPATIONAL SAFETY AND HEALTH PROGRAM
4.) 1 - l.s. - MOBILIZATION/DEMOBILIZATION
5.) 1 - each - INDIVIDUAL REMOVAL OF TREES (LARGE ABOVE 500MMØ UP TO 750MMØ)
6.) 4 - each - REMOVAL OF RCPC (18"Ø) -460MMØ
7.) 18.03 - cu.m. - STRUCTURE EXCAVATION (COMMON SOIL)
8.) 26.10 - cu.m. - EMBANKMENT (FROM BORROW)
9.) 1,037 - sq.m. - SUBGRADE PREPARATION (COMMON MATERIAL)
9.) 143.77 - cu.m. - AGGREGATE BASE COURSE
11.) 916 - sq.m. - PORTLAND CEMENT CONCRETE PAVEMENT (UNREINFORCED), 0.20m THK. - 14 DAYS
12.) 5.88 - cu.m. - STRUCTURAL CONCRETE CLASS "A" (MINOR STRUCTURES)
13.) 12 - m. - PIPE CULVERTS, 460MMØ (18"Ø)
14.) 20.90 - cu.m. - GROUTED RIPRAP, CLASS "A"