CONSTRUCTION OF BOX CULVERT @ BRGY PANTALAN
Description:
1.) 1 - l.s. - PROVISION OF TEMPORARY FACILITIES
2.) 2 - each - PROJECT BILLBOARD/SIGNBOARD
3.) 3.5 - month - OCCUPATIONAL SAFETY AND HEALTH PROGRAM
4.) 1 - l.s. - MOBILIZATION/DEMOBILIZATION
5.) 1 - l.s. - TEMPORARY DIVERSION OF WATERWAYS
6.) 1 - l.s. - REMOVAL OF STRUCTURES AND OBSTRUCTION
7.) 66.03 - cu.m. - STRUCTURE EXCAVATION (COMMON SOIL)
8.) 150.09 - cu.m. - EMBANKMENT (FROM BORROW)
9.) 35.35 - cu.m. - BOULDER FILL
10.) 15.90 - cu.m. - AGGREGATE BASE COURSE
11.) 144.55 - sq.m. - PORTLAND CEMENT CONCRETE PAVEMENT (UNREINFORCED), 0.20m THK. - 14 DAYS
12.) 3,636.77 - kgs. - REINFORCING STEEL BAR, GRADE 40 (MINOR STRUCTURES)
13.) 46.05 - cu.m. - STRUCTURAL CONCRETE CLASS A (MINOR STRUCTURES)
14.) 6.63 - cu.m. - LEAN CONCRETE CLASS B (16.5 MPA)
15.) 34.66 - cu.m. - GROUTED RIPRAP, CLASS "A"