COMPLETION OF ANILAO SUPER HEALTH CENTER

Description
1.) 1 - l.s. - CONSTRUCTION OF FIELD OFFICE FOR THE ENGINEER
2.) 1 - l.s. - PROJECT BILLBOARD/SIGNBOARD
3.) 1 - l.s. - OCCUPATIONAL SAFETY AND HEALTH PROGRAM
4.) 1 - l.s. - MOBILIZATION/DEMOBILIZATION
5.) 39.07 - cu.m. - STRUCTURE EXCAVATION (COMMON SOIL)
6.) 39.24 - cu.m. - EMBANKMENT (FROM STRUCTURE EXCAVATION)
7.) 4.06 - cu.m. - GRAVEL FILL
8.) 8.86 - cu.m. - STRUCTURAL CONCRETE (COLUMN FOOTING, PLACENTA PIT, COUNTER SLABS & SLAB ON FILL -
CLASS A, 14 DAYS)
9.) 10.76 - cu.m. - STRUCTURAL CONCRETE (FOR FOOTING TIE BEAM, COLUMN SUSPENDED SLAB, GIRDER/BEAM
(READY MIX CONCRETE, CLASS A, 14 DAYS)
10.) 2,519.17 - kgs. - REINFORCING STEEL (DEFORMED, GRADE 40)
11.) 85.42 - sq.m. - FORMWORKS AND FALSEWORKS
12.) 298.33 - sq.m. - CHB NON LOAD BEARING (INCLUDING REINFORCING STEEL-100MM THK.
13.) 1 - l.s. - CARPENTRY AND JOINERY WORKS (BOTTOM CABINETS)
14.) 120.75 - sq.m. - ACOUSTIC CEILING BOARD (2ND FLOOR)
15.) 1 - l.s. - STEEL DOORS & FRAMES (GROUND FLOOR & 2ND FLOOR)
16.) 6.66 - sq.m. - ALUMINUM FRAMED FROSTED GLASS DOOR (FIXED TYPE)
17.) 4.44 - sq.m. - ALUMINUM FRAMED CLEAR GLASS DOOR (FIXED TYPE)
18.) 15.12 - sq.m. - ALUMINUM GLASS WINDOW (CASEMENT TYPE)-GROUND FLOOR
19.) 1.80 - sq.m. - ALUMINUM GLASS WINDOW (AWNING TYPE)-GROUND FLOOR
20.) 4.50 - sq.m. - ALUMINUM CLEAR GLASS WINDOW (FIXED TYPE)-2ND FLOOR
21.) 1 - l.s. - DOORS (FLUSH & DOOR FRAMES) GRND FLOOR & 2ND FLOOR
22.) 1 - l.s. - RAILING (2ND FLOOR & WATER TANK)
23.) 72.21 - sq.m. - ALUMINUM CLADDING
24.) 1 - l.s. - FABRICATED SIGNAGES
25.) 812.12 - sq.m. - CEMENT PLASTER FINISH (INTERIOR WALL & ELEVATED WATER TANK)
26.) 20.75 - sq.m. - CEILING (4.5MM FIBER CEMENT BOARD-METAL FRAME)-2ND FLOOR
27.) 130.11 - sq.m. - CEILING (GYPSUM BOARD - METAL FRAME)-2ND FLOOR
28.) 23.03 - sq.m. - SYNTHETIC TILES (FRONT ACCENT)
29.) 259.09 - sq.m. - GLAZED TILES AND TRIM (GROUND FLOOR & 2ND FLOOR)
30.) 943.59 - sq.m. - UNGLAZED TILES (GROUND FLOOR & 2ND FLOOR)
31.) 53.26 - sq.m. - GRANITE SLAB (COUNTERS)
32.) 3,329.65 - sq.m. - PAINTING WORKS (MASONRY/CONCRETE)
33.) 362.29 - sq.m. - PAINTING WORKS (WOOD)
34.) 17.93 - sq.m. - PAINTING WORKS (STEEL)
35.) 117.60 - l.m. - FABRICATED METAL ROOFING ACCESSORY (FLASHING, GAUGE 25) DPWH AREA
36.) 12.40 - l.m. - FABRICATED METAL ROOFING ACCESSORY (GUTTERS, GAUGE 25) DPWH AREA
37.) 16.00 - each - CATCH BASIN
38.) 1 - l.s. - SEWER LINE WORKS
39.) 1 - l.s. - STORM DRAINAGE AND DOWNSPOUT
40.) 1 - l.s. - PLUMBING FIXTURES
41.) 1 - l.s. - COLD WATER LINES (FROM DUG WELL TO BUILDING)
42.) 1 - l.s. - CONDUITS, BOXES & FITTINGS (CONDUIT WORKS/CONDUIT ROUGH-IN)
43.) 1 - l.s. - WIRES & WIRING DEVICES (DPWH AREA & 2ND FLOOR)
44.) 1 - l.s. - PANEL BOARD WITH MAIN & BRANCH BREAKERS (2ND FLOOR)

45.) 1 - l.s. - LIGHTING FIXTURES AND LAMPS (DPWH AREA & 2ND FLOOR)
46.) 1 - l.s. - WATER PUMPING SYSTEM

Date Uploaded: 
Tuesday, October 3, 2023
Opening of Bid Docs: 
Tuesday, October 24, 2023

 

 Municipality of Anilao


  •  Local Government | Our Municipality | Culture &   Tourism | Services |

 Directions


 Poblacion, Anilao, Iloilo, Philippines  5009

 Tel. No.  033 362 0459   033 362 0401

            Fax No. 033 362 0459

 lguanilao@yahoo.com




Connect with Us

   

Municipality of Anilao 

Copyright © 2017. All Rights Reserved.